Customization: | Available |
---|---|
After-sales Service: | One Year |
Application: | Car |
Still deciding? Get samples of US$ 10/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specification
Item
|
Value
|
Product Type
|
Milexuan 7.4L Auto Motor Part GM454 V8 Engine Big Block Forged steel Crankshaft For Chevy Chervolet 454 7.4 |
OE NO.
|
GM454 |
Car make:
|
For Chevy Chervolet 454 7.4 |
Engine NO.
|
7.4L GM454 V8 Engine |
Brand Name
|
Milexuan
|
Product Code
|
Cast Iron Crankshaft |
MOQ
|
1 PCS
|
Warranty
|
One Year
|
Product No.
|
ZJRQ-RC-FD008 0060
|
Certification
|
TS16949
|
Price Term
|
EXW, FOB, CNF, CIF, etc
|
Payment Term
|
30% deposit is accepted, and the balance is paid before shipment
|
Payment Way
|
T/T, L/C, Western Union, Paypal, Escrow ETC
|
Delivery time
|
7 -15days (In Stock)
|
Packages
|
Neutral Package:Plastic,Carton,Wooden case/Pallet or according to customer's request
|
Main products:
cylinder head, cylinder head assembly, long cylinder body, short cylinder body, Connecting Rod, camshaft, crankshaft, power steering pump, EPS, turbocharger, and other automotive accessories.
Chongqing Xuancheng Import & Export Co., Ltd. is a professional supplier of full range of auto parts, electric
power steering ,integrating the development and production together. Our main products include cylinder
head, camshaft, connect rod, steering pump, steering rack, caliper, egr valve, electric power steering etc.
Lead time: If in stock, we can send out goods within 5 working days. If out of stock, based on the qty, the
lead time is 7-45days
shipping by express, by air, by sea are available, if u don't have shipping agent,we also can handle the
shipping for u. By express is about 5-7 working days to your door, and by sea is bout 35days to your door.
Our Advantages:
1. Product certification: IQ9001 and AITF16949 certifications, and we will update more product certifications in
the future.