Customization: | Available |
---|---|
Air Intake System: | for Great Wall |
Body Material: | Aluminium |
Still deciding? Get samples of US$ 899/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specification
Item
|
Value
|
Product Type
|
XC- 2.0L Gasoline Engine Part 4G63 4G63S4M Engine Long Block For Great Wall Hover H3 in 2009 -2016 |
OE NO.
|
4G63 4G63S4M |
Car make:
|
For Great Wall Hover H3 |
Engine NO.
|
4G63 4G63S4M |
Brand Name
|
Milexuan
|
Product Name
|
4G63 4G63S4M Engine Block Assembly |
MOQ
|
3 PCS
|
Warranty
|
One Year
|
Product No.
|
4G63 4G63S4M |
Certification
|
TS16949
|
Price Term
|
EXW, FOB, CNF, CIF, etc
|
Payment Term
|
30% deposit is accepted, and the balance is paid before shipment
|
Payment Way
|
T/T, L/C, Western Union, Paypal, Escrow ETC
|
Delivery time
|
7 -15days (In Stock)
|
Packages
|
Neutral Package:Plastic,Carton,Wooden case/Pallet or according to customer's request
|
Main products:
cylinder head, cylinder head assembly, long cylinder body, short cylinder body, Connecting Rod, camshaft, crankshaft, power steering pump, EPS, turbocharger, and other automotive accessories.
Chongqing Xuancheng Import & Export Co., Ltd. is a professional supplier of full range of auto parts, electric
power steering ,integrating the development and production together. Our main products include cylinder
head, camshaft, connect rod, steering pump, steering rack, caliper, egr valve, electric power steering etc.
Lead time: If in stock, we can send out goods within 5 working days. If out of stock, based on the qty, the
lead time is 7-45days
shipping by express, by air, by sea are available, if u don't have shipping agent,we also can handle the
shipping for u. By express is about 5-7 working days to your door, and by sea is bout 35days to your door.
Our Advantages:
1. Product certification: IQ9001 and AITF16949 certifications, and we will update more product certifications in
the future.