Customization: | Available |
---|---|
After-sales Service: | 1year |
Application: | Car |
Still deciding? Get samples of US$ 100/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item
|
Value
|
Product Type
|
Milexuan Auto Diesel Engine Head Part Complete Cylinder Head F16D3 A16DMS Assembly 96389035 For Chevrolet Aveo Lacetti Optra 2004- |
OE NO.
|
96389035 |
Car make:
|
For Chevrolet Aveo Lacetti Optra 2004- |
Engine NO.
|
F16D3 A16DMS |
Brand Name
|
Milexuan
|
Product Code
|
Cylinder Head Assembly |
MOQ
|
1 PCS
|
Warranty
|
One Year
|
Product No.
|
F16D3 A16DMS |
Certification
|
TS16949
|
Price Term
|
EXW, FOB, CNF, CIF, etc
|
Payment Term
|
30% deposit is accepted, and the balance is paid before shipment
|
Payment Way
|
T/T, L/C, Western Union, Paypal, Escrow ETC
|
Delivery time
|
7 -15days (In Stock)
|
Packages
|
Neutral Package:Plastic,Carton,Wooden case/Pallet or according to customer's request
|
Main products:
cylinder head, cylinder head assembly, long cylinder body, short cylinder body, Connecting Rod, camshaft, crankshaft, power steering pump, EPS, turbocharger, and other automotive accessories.
Chongqing Xuancheng Import & Export Co., Ltd. is a professional supplier of full range of auto parts, electric
power steering ,integrating the development and production together. Our main products include cylinder
head, camshaft, connect rod, steering pump, steering rack, caliper, egr valve, electric power steering etc.
Lead time: If in stock, we can send out goods within 5 working days. If out of stock, based on the qty, the
lead time is 7-45days
shipping by express, by air, by sea are available, if u don't have shipping agent,we also can handle the
shipping for u. By express is about 5-7 working days to your door, and by sea is bout 35days to your door.
Our Advantages:
1. Product certification: IQ9001 and AITF16949 certifications, and we will update more product certifications in
the future.